Recommended video

Mask Factory ISO 8 clean room design

Describe

Views 28

Comments 0

Release time: 03-06 11:21

SUZHOU PHARMA MACHINERY CO.,LTD.

Suzhou Pharma Machinery Co.,ltd. is one of the leading turnkey project providers for pharmaceutical, food, herbal, cosmetic, electronics factory and chemical plants.

The production environment of medical masks must be ISO 8 clean room or above.
Four basic elements of mask workshop construction workshop:
1. License/Third Party Testing
2. Construction of cleanroom workshop above ISO 8 (class100,000)
3. Raw materials
4. Mask Packaging/Sterilizer
For fast installation and easy assemble the design is prefabricated cleanrooms. For personnel: from changing clothes >> hand washing disinfection/buffering >> air shower disinfection >> clean corridor >> all clean workshops must be dust-free. The dust free environment under laminar flow clean room to process.

0 Comments

You must be logged in to post a comment.

    Get In Touch With Us

    • About

      read more
    • Collection

      • contact us

        Telephone:

        Email: